CGWA No Objection Certificate for Groundwater Extraction

Industrial, infrastructure and mining projects extracting groundwater must obtain NOC from Central Ground Water Authority (or the State authority where notified). Annual abstraction-based fee plus mandatory water-conservation measures.

Definition

Industrial, infrastructure and mining projects extracting groundwater must obtain NOC from Central Ground Water Authority (or the State authority where notified). Annual abstraction-based fee plus mandatory water-conservation measures.

What it means in practice

CGWA No Objection Certificate for Groundwater Extraction is administered by Central Ground Water Authority. The obligation is grounded in Revised NOC Guidelines, 24 September 2020 (CGWA) (Para 4-5).

Categorisation of blocks: Safe / Semi-Critical / Critical / Over-Exploited. Over-exploited and critical blocks: NOC granted only with strict conditions or denied.

Triggers (applicability predicates)

These predicates are evaluated by Compliance Radar's applicability engine against a business profile to decide whether this rule applies.

Deadlines and penalty

Cadence: periodic

Penalty for default: Unauthorised extraction: environmental compensation per CGWA penalty schedule (Rs 1-50 lakh based on category) + closure direction.